Tour Alto

Paris | France

The challenge laid in demolishing this 15-storey tower building attached to a glass skyscraper in the heart of the financial centre of the city, as fast as possible, without creating any noise, vibrations and dust, within an non-existent worksite area.

We deconstructed and sealed the structure putting in place the most perfectly organised system that provided real time disposal of the waste. A demolition we performed standing on the tips of our toes.

Height: 12 storeys Volume: 32,000 cbm HxD Timing: 7 months