LYON STATION

LYON |

The challenge was to use the Cut&Drop method, a groundbreaking process, never used before in Europe, to demolish the Lyon station hall without anyone noticing it. This extraordinary demolition won the ‘Collaborative Award’ at the ‘World Demolition Awards’ in 2019.

BUILDING MEASUREMENTS: 17,5 x 19 m HEIGHT: 26 m. VOLUME: 10.000 m³ VXD TIMEFRAME: 4 MONTHS