It was a monumental demolition project performed on tiptoe, partly because the plant was close to a built-up area, and partly because we had to secure some irreparable installations and recover others, before proceeding with the redevelopment of the area. All this is done by using low-invasive systems to prevent the collapse.

AREA: 10.000,000 m² TIMEFRAME: 6 MONTHS