EDISON WIND TURBINES

Foggia |

The challenge was to dismantle and recycle 10 WTGs (wind turbines) in a very tight space, on a hill with a steep slope and high fire risk, in extremely variable weather conditions, with a wide variety of plants to preserve, and non-removable live electrical power line crossings.

AREA: 7.300 m² WEIGHT OF ONE TOWER: 35 TON TIMEFRAME: 45 DAYS