URANIA SHIP

Livorno |

The ship, which was in the floating dock for repairs, keeled over on one side, taking the life of a young worker. Despe was commissioned to carry out the demolition in record time, in unstable weather conditions, with very high pressure from the media and without polluting the sea with oil residues. And it was done safely.

WEIGHT OF THE VESSEL: 1200 TON TIMEFRAME: 1 MONTH