ACN TORCH INSTALLATION (ENI REFINERY)

GELA |

"The ACN plant was used for the production of acrylonitrile and other substances.

A thorough inspection was necessary prior to each intervention to make sure there were no hazardous substances in any equipment. Several active lines also needed to be protected in order for the equipment to operate. Consequently, all safety procedures were kept at the highest level."

VOLUME: 50.000 m³ TIMEFRAME: 4 YEARS