Despe Logo
50 Years Badge
  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW

    Demolition System

  • SCK

    costruction System

  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW
  • SCK
Menu
About us
Sectors
Projects
Contacts
TDW
SCK
SocialInstagramFacebookYoutube
InfoPrivacy PolicyCookie Policy
Whistleblowing

Despe s.p.a., in compliance with D.Lgs. 30 March 2023, n. 24 (c.d. Whistleblowing Decree) has established an internal reporting channel that allows you to report, in writing or orally, in strict confidentiality, violations of national or European Union regulatory provisions, of which the reporting agents have become aware within their working context inside the Company. The reports are addressed and managed by a subject inside the company, autonomous and specifically trained in the matter, in compliance with and in the protection of absolute confidentiality relating to the identity of the reporters and the content of the reports.

despe.whistlelink.comRead document
Despe Logo
© 2025 DESPE S.p.a. società unipersonale Società soggetta all'attività di direzione e coordinamento di Felicità S.r.l P. IVA 00478770167

Via Leonardo da Vinci, 12/14
24060 Torre de’ Roveri (BG)

P. IVA 00478770167
Tel: +39 035 4218100

Site by BARR

Valentino

Retail
London
Retail
London

The challenge of this work, in Old Bond Street in central London, was to shear and demolish the interior staircases, all 5 floors and the façade of the Valentino building, at the same time as the new construction works, all without disturbing the neighbourhood and guaranteeing business as usual. The entire demolition plan was designed to allow the construction company to perform its work. This project was in the shortlist for the ‘World Demolition Awards’ in 2016.

project numbers

DEMOLITION AND MATERIAL HANDLING

300 CBM IN REINFORCED CONDRETE BLOCKS

BLOCK WEIGHTS

10 -15 QUINTALS

TEMPO

5 SETTIMANE

gallery