Despe Logo
50 Years Badge
  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW

    Demolition System

  • SCK

    costruction System

  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW
  • SCK
Menu
About us
Sectors
Projects
Contacts
TDW
SCK
SocialInstagramFacebookYoutube
InfoPrivacy PolicyCookie Policy
Whistleblowing

Despe s.p.a., in compliance with D.Lgs. 30 March 2023, n. 24 (c.d. Whistleblowing Decree) has established an internal reporting channel that allows you to report, in writing or orally, in strict confidentiality, violations of national or European Union regulatory provisions, of which the reporting agents have become aware within their working context inside the Company. The reports are addressed and managed by a subject inside the company, autonomous and specifically trained in the matter, in compliance with and in the protection of absolute confidentiality relating to the identity of the reporters and the content of the reports.

despe.whistlelink.comRead document
Despe Logo
© 2025 DESPE S.p.a. società unipersonale Società soggetta all'attività di direzione e coordinamento di Felicità S.r.l P. IVA 00478770167

Via Leonardo da Vinci, 12/14
24060 Torre de’ Roveri (BG)

P. IVA 00478770167
Tel: +39 035 4218100

Site by BARR

Tour Uap

TDW®
Skyscrapers
Lyon
Skyscrapers
Lyon
TDW®

The Tour Uap in Lyon had to be demolished and replaced with a taller, more functional and technological skyscraper. Despe was awarded the tender contract thanks to its invention ‘TopDownWay®’, a technological self-descending platform, weighing 600 tons and capable of creating more than 1,000 square meters of worksite surface suspended in the air, that retains all that the demolition work produces within itself. This allowed us to perform the demolition safely, swiftly and without creating any disturbance or inconvenience to the environment, to the city or or the nearest shopping center. In just three months the tower had disappeared with the compliments of the Lyon city council. This debut allowed Despe to win the prestigious Job of the Year at the ‘World Demolition Awards’ in 2012.

project numbers

TOWER HEIGHT

100 M

SIZE

600 SQM

FLOORS

22

RECYCLED MATERIAL

95%

DEMOLITION TIME

3 MONTHS

gallery
Video poster