Despe Logo
50 Years Badge
  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW

    Demolition System

  • SCK

    costruction System

  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW
  • SCK
Menu
About us
Sectors
Projects
Contacts
TDW
SCK
SocialInstagramFacebookYoutube
InfoPrivacy PolicyCookie Policy
Whistleblowing

Despe s.p.a., in compliance with D.Lgs. 30 March 2023, n. 24 (c.d. Whistleblowing Decree) has established an internal reporting channel that allows you to report, in writing or orally, in strict confidentiality, violations of national or European Union regulatory provisions, of which the reporting agents have become aware within their working context inside the Company. The reports are addressed and managed by a subject inside the company, autonomous and specifically trained in the matter, in compliance with and in the protection of absolute confidentiality relating to the identity of the reporters and the content of the reports.

despe.whistlelink.comRead document
Despe Logo
© 2025 DESPE S.p.a. società unipersonale Società soggetta all'attività di direzione e coordinamento di Felicità S.r.l P. IVA 00478770167

Via Leonardo da Vinci, 12/14
24060 Torre de’ Roveri (BG)

P. IVA 00478770167
Tel: +39 035 4218100

Site by BARR

The Gallowgate Twins: Bluvale & Whitevale

TDW®
Skyscrapers
Glasgow
Skyscrapers
Glasgow
TDW®

Two towers had to be demolished in a residential and commercial area without the use of explosives. Despe was commissioned by Safedem to intervene with its 'TopDownWay®' system to complete the project with a safety guarantee that no other system in the world could give. Despite the wind conditions were sometimes extreme, reaching over 170 kph, preventing the normal progress of the work, the first tower was demolished in 3 months and the second in 2 and a half months, with no form of repercussion for the local residents living in the district at the base of the towers themselves. This project won the ‘Collaborative Award’ at the ‘World Demolition Awards’ in 2015.

project numbers

TOWER HEIGHT

90 M

FLOORS

31

SIZE

22 M x 20 M

RECYCLED MATERIAL

95%

WIND FORCE

238 KM/H

TIMING

5 MONTHS AND 15 DAYS