Despe Logo
50 Years Badge
  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW

    Demolition System

  • SCK

    costruction System

  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW
  • SCK
Menu
About us
Sectors
Projects
Contacts
TDW
SCK
SocialInstagramFacebookYoutube
InfoPrivacy PolicyCookie Policy
Whistleblowing

Despe s.p.a., in compliance with D.Lgs. 30 March 2023, n. 24 (c.d. Whistleblowing Decree) has established an internal reporting channel that allows you to report, in writing or orally, in strict confidentiality, violations of national or European Union regulatory provisions, of which the reporting agents have become aware within their working context inside the Company. The reports are addressed and managed by a subject inside the company, autonomous and specifically trained in the matter, in compliance with and in the protection of absolute confidentiality relating to the identity of the reporters and the content of the reports.

despe.whistlelink.comRead document
Despe Logo
© 2025 DESPE S.p.a. società unipersonale Società soggetta all'attività di direzione e coordinamento di Felicità S.r.l P. IVA 00478770167

Via Leonardo da Vinci, 12/14
24060 Torre de’ Roveri (BG)

P. IVA 00478770167
Tel: +39 035 4218100

Site by BARR

Refinery

Petrochemical
Gela
Petrochemical
Gela

The challenge was to dismantle a boiler and a chimney stack in a severe state of degradation without creating interference to the surrounding plant systems, which would remain in operation throughout the works. Despe successfully succeeded using two bespoke systems it designed in-house: the ‘Lifting Jacks’ lowering system for the controlled demolition of boilers and the special hydraulic platform ‘Red 0-Ring’. In this manner, 100% safety was guaranteed. This project won the prestigious ‘Industrial Award’ at the ‘World Demolition Awards’ in 2015.

project numbers

IRON

2400 TONS

REINFORCED CONCRETE

1.600 TONS

RECOVERED WASTE

89%

SITE VOLUME

36.000 SQM

TIMING

11 MONTHS

gallery