In order to dismantle the filtration system on the coke side of batteries 9-10, including the TRAV-L-VENT exhaust fumes duct, we had to increase the speed. Due to limited space, the dismantled parts were loaded onto trucks and transported to dedicated areas. Every evening our equipment had to free up the area to meet the customer's needs.
AREA
24.300 M²
TIMEFRAME
11 MONTHS