The challenge was to use the Cut&Drop method, a groundbreaking process, never used before in Europe, to demolish the Lyon station hall without anyone noticing it. This extraordinary demolition won the ‘Collaborative Award’ at the ‘World Demolition Awards’ in 2019.
BUILDING MEASUREMENTS
17.5 X 19 M
HEIGHT
26 M
VOLUME
10.000 M³ VXD
TIMEFRAME
4 MONTHS