Despe Logo
50 Years Badge
  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW

    Demolition System

  • SCK

    costruction System

  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW
  • SCK
Menu
About us
Sectors
Projects
Contacts
TDW
SCK
SocialInstagramFacebookYoutube
InfoPrivacy PolicyCookie Policy
Whistleblowing

Despe s.p.a., in compliance with D.Lgs. 30 March 2023, n. 24 (c.d. Whistleblowing Decree) has established an internal reporting channel that allows you to report, in writing or orally, in strict confidentiality, violations of national or European Union regulatory provisions, of which the reporting agents have become aware within their working context inside the Company. The reports are addressed and managed by a subject inside the company, autonomous and specifically trained in the matter, in compliance with and in the protection of absolute confidentiality relating to the identity of the reporters and the content of the reports.

despe.whistlelink.comRead document
Despe Logo
© 2025 DESPE S.p.a. società unipersonale Società soggetta all'attività di direzione e coordinamento di Felicità S.r.l P. IVA 00478770167

Via Leonardo da Vinci, 12/14
24060 Torre de’ Roveri (BG)

P. IVA 00478770167
Tel: +39 035 4218100

Site by BARR

Iron blast furnace

Industry
Clabeque
Industry
Clabeque

The challenge was to demolish an iron Blast Furnace weighing 7,000 tons without the use of explosives, protecting the environment, the adjacent building that housed reclamation plant systems and houses standing just 60 metres away. Despe made the industrial structure collapse using a thrust hydrodynamic system controlled by a PLC computer, achieving a collapse devoid of most of the side effects common to explosive materials. The whole furnace collapsed within seconds without creating any form of damage.

project numbers

FOURNACE HEIGHT

90 M

WEIGHT

7.000 TONS

TIMING

5 SECONDS

gallery