The challenge was to demolish an industrial area of immense dimensions, in record time, to prepare for the construction of the new Esselunga facility. This former steelworks was the centre of a heavy steel processing industry, hence the need for a zero-impact demolition; Despe completed the works by operating in six different areas simultaneously, using a fleet of machines and equipment unique across the globe.
SITE VOLUME
940.000 CBM
TIMING
6 MONTHS
RECYCLED VOLUME
94%
CARPENTRY
26.000 TONS