Despe Logo
50 Years Badge
  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW

    Demolition System

  • SCK

    costruction System

  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW
  • SCK
Menu
About us
Sectors
Projects
Contacts
TDW
SCK
SocialInstagramFacebookYoutube
InfoPrivacy PolicyCookie Policy
Whistleblowing

Despe s.p.a., in compliance with D.Lgs. 30 March 2023, n. 24 (c.d. Whistleblowing Decree) has established an internal reporting channel that allows you to report, in writing or orally, in strict confidentiality, violations of national or European Union regulatory provisions, of which the reporting agents have become aware within their working context inside the Company. The reports are addressed and managed by a subject inside the company, autonomous and specifically trained in the matter, in compliance with and in the protection of absolute confidentiality relating to the identity of the reporters and the content of the reports.

despe.whistlelink.comRead document
Despe Logo
© 2025 DESPE S.p.a. società unipersonale Società soggetta all'attività di direzione e coordinamento di Felicità S.r.l P. IVA 00478770167

Via Leonardo da Vinci, 12/14
24060 Torre de’ Roveri (BG)

P. IVA 00478770167
Tel: +39 035 4218100

Site by BARR

Former State Railroad headquarters

Real Estate
Turin
Real Estate
Turin

Demolishing a building in the centre of Turin without interfering with the traffic or creating an inconvenience to residents is a challenge that requires extensive technical preparation and organisation. The characteristics of this intervention were so particular as to require specific solutions both from a technical and operational viewpoint, and also containment of environmental impacts. We used a tracked excavator with a specially designed telescopic arm equipped with crushers, to deconstruct the building standing about 40 metres in height. The difficulty lay in being able to control the fall of the debris within the reduced spaces of the construction site. To limit the dispersion of cement dust we patented the “Dust Buster”. This project won the prestigious ‘Urban award’ at the ‘World Demolition Awards’ in 2010.

project numbers

MACHINES

CASE CX800 WITH 40 M ARM

OVERALL VOLUME

50.000 CBM

TIMING

2 MONTHS

gallery
Video poster