Despe Logo
50 Years Badge
  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW

    Demolition System

  • SCK

    costruction System

  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW
  • SCK
Menu
About us
Sectors
Projects
Contacts
TDW
SCK
SocialInstagramFacebookYoutube
InfoPrivacy PolicyCookie Policy
Whistleblowing

Despe s.p.a., in compliance with D.Lgs. 30 March 2023, n. 24 (c.d. Whistleblowing Decree) has established an internal reporting channel that allows you to report, in writing or orally, in strict confidentiality, violations of national or European Union regulatory provisions, of which the reporting agents have become aware within their working context inside the Company. The reports are addressed and managed by a subject inside the company, autonomous and specifically trained in the matter, in compliance with and in the protection of absolute confidentiality relating to the identity of the reporters and the content of the reports.

despe.whistlelink.comRead document
Despe Logo
© 2025 DESPE S.p.a. società unipersonale Società soggetta all'attività di direzione e coordinamento di Felicità S.r.l P. IVA 00478770167

Via Leonardo da Vinci, 12/14
24060 Torre de’ Roveri (BG)

P. IVA 00478770167
Tel: +39 035 4218100

Site by BARR

Fire emergency Fiumicino Airport

Disaster Recovery
Rome
Disaster Recovery
Rome

The challenge was to be able to deconstruct, piece by piece, a burnt down wing of the airport, without anyone noticing, without the normal aircraft-passenger traffic at Terminal 3 of an international airport incurring interruptions, without diffusing pollutants resulting from the fire in confined spaces with little room for manoeuvre and worksite times and notice of the construction site of just two hours. The operation was planned by our team in close collaboration with the client and works required the use of remote controlled video assisted robots. In just a month and a half, the situation returned to normal. This project was in the shortlist at the ‘World Demolition Awards’ in 2016.

project numbers

TIMING

45 DAYS

gallery