The challenge was to dismantle and recycle 10 WTGs (wind turbines) in a very tight space, on a hill with a steep slope and high fire risk, in extremely variable weather conditions, with a wide variety of plants to preserve, and non-removable live electrical power line crossings.
AREA
7.300 M²
WEIGHT OF ONE TOWER
35 TON
TIMEFRAME
45 DAYS