We were involved in a massive reclamation project in the former Ote area, where the new Chorus Life district is currently being built. The contracted works included a displacement of 85,000.00 cubic metres at a depth of 11 metres from the pavement starting point, with low load-bearing and wet soil. Despe implemented a system that provided a safe working environment.
AREA
250.000 M²
TIMEFRAME
23 MONTHS IN TOTAL