Despe Logo
50 Years Badge
  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW

    Demolition System

  • SCK

    costruction System

  • About us
  • Sectors
  • Projects
  • Contacts
  • TDW
  • SCK
Menu
About us
Sectors
Projects
Contacts
TDW
SCK
SocialInstagramFacebookYoutube
InfoPrivacy PolicyCookie Policy
Whistleblowing

Despe s.p.a., in compliance with D.Lgs. 30 March 2023, n. 24 (c.d. Whistleblowing Decree) has established an internal reporting channel that allows you to report, in writing or orally, in strict confidentiality, violations of national or European Union regulatory provisions, of which the reporting agents have become aware within their working context inside the Company. The reports are addressed and managed by a subject inside the company, autonomous and specifically trained in the matter, in compliance with and in the protection of absolute confidentiality relating to the identity of the reporters and the content of the reports.

despe.whistlelink.comRead document
Despe Logo
© 2025 DESPE S.p.a. società unipersonale Società soggetta all'attività di direzione e coordinamento di Felicità S.r.l P. IVA 00478770167

Via Leonardo da Vinci, 12/14
24060 Torre de’ Roveri (BG)

P. IVA 00478770167
Tel: +39 035 4218100

Site by BARR

Bridge on the river Po

Infrastructure
Piacenza
Infrastructure
Piacenza

This intervention won the award for the best job in the world at the 'World Demolition Awards' of 2012, and was the subject of a National Geographic Channel documentary. The challenge was to be able to demolish the part of the bridge over the river, protecting the piles, without harming the environment, without allowing material to fall on the river bed; all this while handling high tide, currents and the different levels of the River Po. Thanks to a purpose built system, consisting of hydraulic jacks placed on floating barges, some of the steel portions of the bridge, about 150 tons in weight, were raised during navigation and then spectacularly transported to dry land.

project numbers

BRIDGE LENGHT

1 KM

LENGHT OF THE BRIDGE OVER THE RIVER

200 M

BRIDGES PORTIONS RAISED

3 X 45 M

TIMING

90 DAYS

gallery
Video poster