The challenge was to demolish a former industrial facility, with zero environmental impact, avoiding all interference with the operational and production activities taking place 24/7 in the area, in record time: just 7 weeks. The simultaneous use of different equipment and work teams allowed us to complete the work ahead of time.
VOLUME
90.000 CBM HXD
DEMOLITION WASTE
20.000 TONS
TIMING
7 WEEKS