For the first time we were faced with the demolition of a practically new earthquake-proof structure, built in 2017. It was a great challenge for which we designed and built new equipment capable of completing this mega demolition and attacking this super reinforced concrete.
VOLUME
550.000 M³ VXP
SURFACE AREA
255,00 M²
TIMEFRAME
7 MONTHS