The challenge of this intervention was to demolish parts of the disused factory adjacent to the production site. We had to carry out a vibration-free and dust-free demolition because the factory's machinery and personnel were fully operational throughout the entire duration of the project.

VOLUME: 150.000 m³ TIMEFRAME: 1 YEAR