EXXON MOBIL REFINERY

NOTRE DAME DE GRAVENCHON |

In record time and working on different levels at the same time, we completed the asbestos abatement and demolition of the old power station. This had the engine room and four boilers inside the existing and operating Exxon Mobile refinery.

STEEL STRUCTURES: 2.000 m³ AREA: 35.000 m³ VXD HEIGHT: 30 m TIMEFRAME: 11.5 MONTHS