Hotel Vista Palace

Cap Martin | France

We used a mix of technologies to perform the demolition, strip out and deconstruction of the Hotel, with around 2,000 sqm floorspace located at a height of 300 metres overlooking the sea, and comprised of different types of buildings, and built a scaffolding plus a protection net on 3 sides of the building to guarantee that nothing could fall from the building. A surgical demolition.

Volume: 26,000 cbm HxD Timing: 6 months Park: 45,000 sqm