MUNGIVACCA BUILDING

BARI |

The requirement to demolish the building without the residential neighbourhood being affected has been fully met by keeping vibrations, dust and noise to the minimum.

VOLUME: 35.000 m³ VXD TIMEFRAME: 3 MONTHS