FORMER NOKIA AREA

CASSINA DE’ PECCHI (MI) |

This massive reclamation project, the dismantling and demolition of 22 buildings in a disused building complex, was successfully completed. The main challenge was posed by the timeframe, which forced us to overlap throughout all the work phases.

AREA: 365,000 m³ VXD NUMBER OF BUILDINGS 22 TIMEFRAME: 8 MONTHS