This massive reclamation project, the dismantling and demolition of 22 buildings in a disused building complex, was successfully completed. The main challenge was posed by the timeframe, which forced us to overlap throughout all the work phases.
AREA: 365,000 m³ VXDNUMBER OF BUILDINGS 22TIMEFRAME: 8 MONTHS